‘Real-world, market-beating’: ITM CTO reveals operating data from 10MW Shell project

ITM Power Chief Technology Officer (CTO) Dr Simon Bourne bucked industry trends during an analyst call to reveal real-world operating data of the company’s PEM electrolysers.

Showcasing statistics from ITM’s 10MW installation at Shell’s Refhyne 1 plant in Germany between May 2024 and March 2025, Bourne said the firm’s Trident stacks operated between 30% and 100% load.

This is a paid article, to read the article in full you can
sign in if you are subscribed or
subscribe today.